The Winners Are Set to Be Announced for the Energy Storage Awards!

Energy Storage Awards, 21 November 2024, Hilton London Bankside

CATL provides more details on ‘zero-degradation’ Tener BESS product at ees Europe

LinkedIn
Twitter
Reddit
Facebook
Email

CATL, the world’s largest lithium-ion OEM, has given more details around its new battery energy storage system (BESS) product, Tener, including the company’s claims its cells will not degrade in the first five years of operation.

The China-based company gave technical details and market comments to Energy-Storage.news during a presentation and media workshop at the ees Europe event, held in parallel with Intersolar Europe at the Smarter E clean energy conference and trade show in Munich, Germany today (19 June).

This article requires Premium SubscriptionBasic (FREE) Subscription

Enjoy 12 months of exclusive analysis

  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Annual digital subscription to the PV Tech Power journal
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

CATL announced the new grid-scale BESS product in April this year, with two significant claims about its performance. The first was an industry-leading energy density of 6.25MWh of energy storage capacity per 20-foot container. The second was the the battery cells would suffer zero degradation for the first five years of operation.

In a Q&A with journalists, CATL executives Hank Zhao, CTO of ESS Europe, and Kevin Tang, director of ESS Europe, explained how it achieved – or claims to have achieved – the second, which had been a topic of lively discussion throughout the industry.

It is a by a combination of pre-lithiation, or lithium compensation, combined with reducing the consumption of lithium-ions during battery cycles themselves, they said. This was speculated by industry sources shortly after the announcement, as covered in our follow-up piece (Premium access).

The benefit of this to the end-consumer is a higher throughput on the BESS during those first years, and the ability to push out augmentation of a BESS to seven or eight years after deployment, rather than three or five. All this means a more cost-effective deployment, they added.

Rolls-Royce, via its power systems business, is among the first system integrators to announce a partnership with CATL to deploy projects using Tener, saying today that it would use it for projects in the EU and the UK.

In response to questions from Energy-Storage.news around why it had applied the zero-degradation battery technology to grid-scale BESS and not electric vehicles (EVs) Tang and Zhao said that the underlying technology had been used in some vehicle applications, though not passenger vehicles.

The reason it has been applied to BESS first is that that market demands more improvements around long lifetime for the batteries, compared with the EV segment. Demands for such lifetime-improving tech could be applied to EV batteries, but would be done in line with customer demand, the executives said.

Read Next

Premium
November 27, 2024
Fluence has ‘met or exceeded’ its financial guidance metrics for its 2024 fiscal year and expects to see ‘significant growth’ in its FY2025.
November 27, 2024
Callum McGuinn, partner at European intellectual property (IP) firm Mewburn Ellis, rounds up the major advancements in battery cell technology that BESS industry sources should be aware of.
November 26, 2024
A flurry of major grid-scale BESS news in Finland, the Netherlands, Germany and France about projects which could all be described as the largest in those countries.
November 25, 2024
European battery company Northvolt has filed for Chapter 11 ‘reorganisation’ bankruptcy in the US, which it said will allow it to restructure its debt to continue scaling the business.
Premium
November 21, 2024
NextEra Energy Resources (NEER) has become the next IPP to seek approval of a renewable energy development incorporating battery storage via the California Energy Commission’s (CEC’s) opt-in process, as permitted under Assembly Bill (AB) 205. 

Most Popular

Email Newsletter